Tender | Bidding Announcement for the Slaughterhouse Expansion Project at the Guozhuang Branch of Hebei Leshou Duck Industry Co., Ltd.
Release date:
2023-03-18
This project quotation includes taxes and is presented as a detailed bill of quantities, with no upfront payment required. Each work process will undergo individual acceptance checks, followed by a comprehensive final验收 (acceptance). Payment for the project will be settled based on the actual completed volume of work multiplied by the winning bid's unit price. Upon successful completion of all验收 processes, 95% of the final settlement amount will be paid, while the remaining 5% will be held as a warranty deposit. This deposit will be fully released one year after the project concludes, provided there are no quality issues. (Detailed list attached.)
I. Project Name and Tender Description
1. Project Name: Expansion Construction Project for the Slaughterhouse Shed at Leshou Duck Farm, Guozhuang Branch.
2. This tender is for the construction project of the expansion of the slaughterhouse shed at the Guozhuang Branch of Leshou Duck Industry Company, conducted in accordance with the company’s bidding procedures. The winning bidder will then sign a formal construction contract with the company.
3. Scope of Tender and Construction Requirements
Construction details: Expansion of the slaughterhouse area—extend the southern waiting shed to the south and the northern waiting shed to the north (refer to the design drawings for specifics).
Construction requirements:
(1) Extend one bay southward (south-side slaughtering shed)
Remove the capping panels and wind-resistant columns from the southern gable wall of the original slaughterhouse shed, then carefully slide the entire steel frame structure 6 meters southward and reinstall it. Reinforce the setup by adding new wind-resistant columns. Additionally, relocate the deodorization equipment’s steel frame 2.5 meters northward. All steel columns and beams will be made from 350x175 H-shaped steel sections, connected using high-strength bolts. The purlins will be constructed from hot-dip galvanized C-channel steel measuring 160x50x2.5 mm, topped with an iron-plastic mesh (40x40x2.5 mm) and layered with 70 mm-thick, 19 kg/m³ thermal insulation rock wool. Finally, enclose the structure with colored steel panels (Sky Blue, 0.5 mm thick), installing side panels along the east, south, and west walls—complete with perimeter beams and diagonal bracing—and finishing the sides with single-layered Sky Blue-colored steel panels (0.4 mm thick). On the west side, extend the water channel gutter an additional 3.5 meters southward, ensuring that its height and slope match those of the original slaughterhouse shed.
(2) Expanding 2 bays northward (north-side slaughterhouse shed)
The original gable end wall panel and wind-resistant column at the north end of the former slaughterhouse shed were removed, then relocated 15 meters northward and reinstalled as a single rigid frame. An additional wind-resistant column was added, along with a second rigid frame installed in the center. All steel frame columns and beams are made from 350x175 H-shaped steel, connected using high-strength bolts. The purlins are constructed from hot-dip galvanized C-channel steel measuring 160x50x2.5 mm, topped with an iron-plastic mesh (40x40x2.5 mm) and layered with 70-mm-thick, 19-kg thermal insulation rock wool. Finally, the structure is sealed with colored steel panels (Sky Blue, 0.5 mm thick), with the east and north sides also enclosed using the same type of colored steel panels (Sky Blue, 0.4 mm thick). Meanwhile, the water trough gutter on the west side has been extended 15 meters northward, and downspouts have been added to ensure proper drainage.
Please contact the tendering representative to obtain detailed drawings, construction plans, quotation lists, and other documents outlining the scope of work for the above projects.
Bidding Instructions
1. Contracting method: Turnkey contract—labor and materials included.
2. Quality Standards: All items must comply with current national or industry design codes and construction acceptance criteria, meeting or exceeding quality standards.
3. Scope of the tender: All items included in the drawings and the bill of quantities.
4. The company will hold a centralized on-site inspection from March 18 to March 24. Please arrange to visit the site during this period to prepare your bidding documents. If you're interested in participating, please deliver or mail your bid documents (ensure the proposal is sealed) to the company by 6:00 PM on March 24. , Delivery Address: Bidding & Procurement Office, Leshou Agricultural and Pastoral Group, 3rd Floor, Administration Department, Qilizhuang Village, Leshou Town, Xian County, Cangzhou City, Hebei Province. Contact Person: Manager Tang, Phone: 18632798771. Participation in the bid opening is contingent upon receipt of your tender; please refer to the instructions provided for further details on how to participate.
Bidding Method
Public Tender
Bidding Requirements
1. Breakdown of the quotation, quotation method, and payment terms
This project quotation is inclusive of taxes and presented as a detailed bill of quantities, with no upfront payment required. Each work process will undergo individual acceptance checks, followed by a comprehensive final验收 (acceptance). Payment for the project will be settled based on the actual completed volume of work multiplied by the winning bid's unit price. Upon successful completion of all验收 processes, 95% of the final settlement amount will be paid, while the remaining 5% will be held as a warranty deposit. This deposit will be fully released one year after the project concludes, provided there are no quality issues. (Detailed list attached.)
2. Construction Schedule Requirement: Completion within one month after the construction contract is signed following the completion of tendering.
3. Award Method: Winning by the lowest reasonable price following a comprehensive evaluation
Note: Within 3 days of being awarded the bid, the winning bidder must sign the contract (agreement).
4. Conduct on-site surveys independently; no additional costs will be incurred for increased construction difficulty or measures taken.
Bidding for Provision of Materials
1. Business License
2. After being signed and confirmed by the bidder, complete the bill of quantities for the bid price.
3. Construction organization design corresponding to the bid quotation (including construction methods and quality assurance measures).
Bidding Method
Our company will publish the tender documents on the Leshou Group official WeChat account on March 18, 2023. All bidding companies are requested to submit their bid documents, along with company qualifications and other required materials—either in person or by mail—to our office by March 24, 2023, as specified in the tender documents. The company has scheduled an on-site comprehensive bid opening and evaluation session for 9:00 a.m. on Saturday, March 25, 2023, in Conference Room No. 1.
Contact:
On-site investigation contact:
Manager Gao: 15530722068
Bid Contact:
Manager Tang: 18632798771
Hebei Leshou Duck Industry Co., Ltd.
March 18, 2023